Cabinetry & Millwork: Defective Design or Defective Workmanship? Who is Responsible?

By: Michael Panish
Tel: 888-902-4272
Email Mr. Panish


View Profile on Experts.com.


My job as a cabinetry and millwork expert witness is to inspect and evaluate casework, cabinetry, or millwork that may have either failed or may be deficient in some way. Many of the past cases where I have been designated as the cabinetry and millwork expert witness have involved analyzing products that no longer exist because they have either been replaced or destroyed. What is available for review is often in the form of architectural elevations (renderings), photographs of the damaged cabinetry, or shop drawings and samples of the materials that were used. Generally, there is a question as to what entity is responsible for the monetary loss sustained. The usual course of action by attorneys is to sue all parties in the chain of events, from design through installation.

Many times a cursory inspection reveals basic construction flaws that were the fault of the fabricators and installers. A cabinet job simply was not manufactured to satisfy the needs of the client, either in form, size or function, or the perfectly built cabinetry was ruined by the inexperienced or low quality installation. Many times finishes are the prime concern. The ultimate appearance of the finished product may not be acceptable to the owner or the client. Misrepresentation of products, finish samples and unconfirmed choices are often to blame for the latter dispute. Further disputes develop over contracted services, promises and agreements that were not specifically spelled out in the work order or project contract. In some cases, the client or unhappy owner is unrealistic as to their expectations and are unwilling to take responsibility for their actions.

Resolving the above disputes is generally an easier situation than a case that results in serious personal injury. It is mostly a matter of book keeping, record analysis, and knowledge of the industry practices and standards that dictate the equitable settlement of these claims.

In a personal injury claim, the stakes are usually much greater. The responsibility of the individually involved parties is more difficult to quantify and isolate and sometimes liability is shared and commingled. The size and scope of the project often influences the various levels of culpability of the involved parties.

When discussing a major project for a hotel remodel, such as cabinetry, casework, or millwork, it is usually part of a total design package initiated by the design and development department of that entity. Sometimes designs are generated from in-house designers but are often contracted out to an outside designer service. If a new retail outlet such as a bank or chain store requires new cabinets, a designer or architect usually becomes the lead entity. Conceptual designs are frequently contracted out to specific trades through these architectural and or design firms to develop a standardized franchise concept. In the case of a housing tract or condominium development, architects and designer services generally share the development of the spatial and cosmetic concepts in these projects.

In all cases, individual circumstances affect the level of involvement and participation percentage that an entity claims interest in. Design flaws created by an architect or designer could be directly linked to product failure. A responsible cabinet manufacturer must have the competence and ability to interpret flaws in a design concept and address the problem prior to fabrication of these flawed products. While an architect could be seen as the general overseer of a project and ultimately responsible for the injury, it has also been the case that the ultimate liability for an injury can be the responsibility of the last person that touched the product. However, every case is different.

In one recent personal injury case that took place in a renovated hotel, blame was shared among six different parties. The cabinet contractor, cabinet installers, designers, architects, hotel management and project managers were all willing to participate in settlement. In another case which is still ongoing, each contractor and designer involved is attempting to place the blame on every entity but themselves in an effort to remove their level of involvement and extricate their companies from the lawsuit.

It is of the utmost importance to find a cabinetry expert witness that has had years of hands on experience in these types of projects. There are many variables that would only be known to a skilled tradesman, and questions that can be formulated with the help of this expert will greatly enhance the perspective that can be formulated after accurate and precise questions are answered during your discovery and investigation.


Michael Panish is the most frequently retained expert witness in the country for both plaintiff and defense cases involving overhead doors, automatic doors, and manual door systems. He has a thorough understanding of these door systems and a hands-on background that provides a basis for his expert opinions and working expertise. Mr. Panish has been retained on numerous cases that have quickly resolved after his involvement. He has been brought into many cases to replace previous experts that were unable to explain or identify the issues of causation. He has personally serviced, installed, and maintained major brand door products for many years. He is the author of many articles that cover most aspects of door components, door hardware, and door injury claims. Visit his website at www.constructionwitness.com for a list of relevant articles and to view all of his expert and consulting services.

©Copyright - All Rights Reserved

DO NOT REPRODUCE WITHOUT WRITTEN PERMISSION BY AUTHOR.

Related articles

richard_long_photo.jpg

4/28/2022· Construction

Schedule And Delay Analysis Methodologies

By: Long International

The equitable allocation of responsibility for project delays is essential to the resolution of many construction disputes. Contractors frequently assert that they have been delayed for reasons beyond their control. Owners often remain unconvinced that the Contractor is legitimately

stanley-Stephenson-Photo.jpg

5/28/2013· Construction

Assessing Damages Arising From Construction Defects

By: Dr. Stanley Stephenson

Defects that were introduced during construction can lead to classic legal disputes between owners and contractors where considerable sums of money are involved.

Thomas-Barth-Crane-Logo.jpg

7/31/2015· Construction

Tower Cranes Warrant Closer Look

By: Thomas Barth

According to statistics, about 125,000 tower cranes are operating worldwide and, on average, are erected in 2 days on various jobsites to build skyscrapers. There are two types of cranes, tower and mobile, which can be purchased or rented depending on the company's scope of work. Mobile cranes are limited because they must be moved from location to location on the jobsite to maneuver materials. Tower cran es can be placed closer toge ther, have a radius of about 140 square meters, and can lift steel, concrete, and a va riable range of building material. Contractors can save 50 percent on the cost of material handling by using self-erecting tower cranes and onsite labor, saving thousands. Due to the flexibility of tower cranes, they are becoming more commercialized and are high in demand.

;