A local Mortgage Company referred an Attorney to one of their clients because they were having construction problems. Their clients did not want the final disbursements made until these issues were resolved. When the client contacted the Attorney there was a discussion about several punch list items that had not been addressed by the General Contractor, which they wanted fixed before final payment. The Attorney knew it would be more cost effective for him to stay in his office and conduct business than to visit the site. In addition, the Attorney had enough wisdom concerning his ability to readily ascertain defective conditions, code compliance, and/or manufacturers recommendations in the installation of their particular product.

Therefore the Attorney recommended Clinton J. Ford P.A. go to the site and ascertain the significance of the complaint prior to an office appointment with these new clients. Upon arrival to the site, Clinton J. Ford P.A. found the building to be esthetically pleasing. However upon extensive evaluation and multiple discussions with the Owner the home was found to be uninhabitable. Therefore habitability of the home could result in dangerous life and safety issues for the occupants.

During the progression of the building investigation it was found that the electrical wiring had been completed by employees of the General Contractor as the Electrical Contractor would not return to the project because of payment issues. Furthermore, it was also determined the plumbing contractor had not installed a shower pan in the walk in shower and much of the plumbing was also completed by the General Contractors employees.

The roof membrane and sheathing had already been removed once during the progression of the construction project because of improper installation but there were still problems with the new installation. In addition there were numerous framing and hurricane hardware problems found throughout the building which significantly diminished its ability to resist uplift during periods of inclement weather and high winds.

The building was in such poor condition that Clinton J. Ford P.A. arranged a site meeting with the County's Building Official and their building inspector including the Owners to review a fifty page report and numerous photographs and other documents to substantiate the complaint. After review of the report and inspection of certain electrical issues the Building Official preceded to rescind the Certificate of Occupancy and request the General Contractor to remedy all adverse conditions.

Though the case has not been resolved at this time, the Attorney has been providing legal assistance during its progression without losing valuable downtime by site visits and fact accumulation thereby optimizing his billable time on this case bringing a benefit to his clients.


Clinton J. Ford, MS, CGC, ACA, CIE, has over 24 years of experience as a State Certified General Contractor. He provides consulting support to clients and or attorneys who need assistance during Pre-trial and or Trial, pre or post termination of contractor, investigation of contractor or sub-contractors, licensure issues, permitting issues and or other.

©Copyright - All Rights Reserved

DO NOT REPRODUCE WITHOUT WRITTEN PERMISSION BY AUTHOR.

Related articles

long-international-logo.jpg

1/15/2018· Construction

Project Team Motivators and Demotivators

By: Long International

The leader of a corporation or project is the individual who must ultimately be willing to take responsibility for results. Within the context of an organization or team made up of individuals, it is the collective performance of the individuals, as a team, that defines the results of the whole. While it can be said that the best motivation is internal motivation as opposed to external motivation, the leader is ultimately the one responsible for creating the conditions where motivation can thrive.

coleman-horowitt-logo.jpg

6/21/2018· Construction

Court Determines Sanitary District Can Use Its Own Employees for Construction Projects

By: Darryl Horowitt

The Public Contracts Code generally provides that contracts for certain dollar amounts, generally exceeding $15,000 to $25,000, must be sent out for bid and let to the lowest responsible bidder after appropriate notice is given. Public Contracts Code § 20803, which governs sanitary districts, contains such a requirement for any contract exceeding $15,000.

richard_long_photo.jpg

4/28/2022· Construction

Schedule And Delay Analysis Methodologies

By: Long International

The equitable allocation of responsibility for project delays is essential to the resolution of many construction disputes. Contractors frequently assert that they have been delayed for reasons beyond their control. Owners often remain unconvinced that the Contractor is legitimately

;