Case Study: Certificate Of Occupancy Rescinded

By: Mr. Clinton Ford
Tel: 386-462-9144, 866-784-2597, 352 514-1087 (Cell)
Email Mr. Ford


View Profile on Experts.com.


A local Mortgage Company referred an Attorney to one of their clients because they were having construction problems. Their clients did not want the final disbursements made until these issues were resolved. When the client contacted the Attorney there was a discussion about several punch list items that had not been addressed by the General Contractor, which they wanted fixed before final payment. The Attorney knew it would be more cost effective for him to stay in his office and conduct business than to visit the site. In addition, the Attorney had enough wisdom concerning his ability to readily ascertain defective conditions, code compliance, and/or manufacturers recommendations in the installation of their particular product.

Therefore the Attorney recommended Clinton J. Ford P.A. go to the site and ascertain the significance of the complaint prior to an office appointment with these new clients. Upon arrival to the site, Clinton J. Ford P.A. found the building to be esthetically pleasing. However upon extensive evaluation and multiple discussions with the Owner the home was found to be uninhabitable. Therefore habitability of the home could result in dangerous life and safety issues for the occupants.

During the progression of the building investigation it was found that the electrical wiring had been completed by employees of the General Contractor as the Electrical Contractor would not return to the project because of payment issues. Furthermore, it was also determined the plumbing contractor had not installed a shower pan in the walk in shower and much of the plumbing was also completed by the General Contractors employees.

The roof membrane and sheathing had already been removed once during the progression of the construction project because of improper installation but there were still problems with the new installation. In addition there were numerous framing and hurricane hardware problems found throughout the building which significantly diminished its ability to resist uplift during periods of inclement weather and high winds.

The building was in such poor condition that Clinton J. Ford P.A. arranged a site meeting with the County's Building Official and their building inspector including the Owners to review a fifty page report and numerous photographs and other documents to substantiate the complaint. After review of the report and inspection of certain electrical issues the Building Official preceded to rescind the Certificate of Occupancy and request the General Contractor to remedy all adverse conditions.

Though the case has not been resolved at this time, the Attorney has been providing legal assistance during its progression without losing valuable downtime by site visits and fact accumulation thereby optimizing his billable time on this case bringing a benefit to his clients.


Clinton J. Ford, MS, CGC, ACA, CIE, has over 24 years of experience as a State Certified General Contractor. He provides consulting support to clients and or attorneys who need assistance during Pre-trial and or Trial, pre or post termination of contractor, investigation of contractor or sub-contractors, licensure issues, permitting issues and or other.

©Copyright - All Rights Reserved

DO NOT REPRODUCE WITHOUT WRITTEN PERMISSION BY AUTHOR.

Related articles

michael_wright_photo.jpg

1/27/2011· Construction

Sustainable Safety: A Lifecycle Strategy for Fall Prevention

By: Michael C. Wright

The traditional methodology for addressing safety for facilities, machines or products is for owners, architects, engineers, consultants, contractors and vendors to complete the design, engineering, construction or fabrication of a project based on past knowledge, experience and training.

acorn_logo.gif

4/11/2005· Construction

Things You Can Do To Avoid Conflict In The Design And Construction Of Building Projects

By: William R. Acorn

Introduction: In our first Volume of the Forensic Exchanger, we discussed some of the all too many reasons why HVAC systems fail. If you missed that edition and are interested in that topic e-mail us and we will gladly send it to you. We will follow up with more discussion of that important topic in later editions

michael-panish-logo.gif

2/18/2015· Construction

M. O. A. T. A New Approach to School Security

By: Michael Panish

The need to have increased security to public venues such as airports, schools, religious facilities, day care centers, shopping centers, and government buildings is nothing new. However, it has become apparent that many unexpected assaults and deadly attacks are coming from individuals that have gained a certain level of intimacy with the venues and organizations that they are invading. The attackers are not necessarily strangers, but people we know.

;
Experts.com-No broker Movie Ad

Follow us

linkedin logo youtube logo rss feed logo
;