banner ad
Experts Logo

articles

Case Study: Certificate Of Occupancy Rescinded

By: Mr. Clinton Ford
Tel: 386-462-9144, 866-784-2597, 352 514-1087 (Cell)
Email Mr. Ford


View Profile on Experts.com.


A local Mortgage Company referred an Attorney to one of their clients because they were having construction problems. Their clients did not want the final disbursements made until these issues were resolved. When the client contacted the Attorney there was a discussion about several punch list items that had not been addressed by the General Contractor, which they wanted fixed before final payment. The Attorney knew it would be more cost effective for him to stay in his office and conduct business than to visit the site. In addition, the Attorney had enough wisdom concerning his ability to readily ascertain defective conditions, code compliance, and/or manufacturers recommendations in the installation of their particular product.

Therefore the Attorney recommended Clinton J. Ford P.A. go to the site and ascertain the significance of the complaint prior to an office appointment with these new clients. Upon arrival to the site, Clinton J. Ford P.A. found the building to be esthetically pleasing. However upon extensive evaluation and multiple discussions with the Owner the home was found to be uninhabitable. Therefore habitability of the home could result in dangerous life and safety issues for the occupants.

During the progression of the building investigation it was found that the electrical wiring had been completed by employees of the General Contractor as the Electrical Contractor would not return to the project because of payment issues. Furthermore, it was also determined the plumbing contractor had not installed a shower pan in the walk in shower and much of the plumbing was also completed by the General Contractors employees.

The roof membrane and sheathing had already been removed once during the progression of the construction project because of improper installation but there were still problems with the new installation. In addition there were numerous framing and hurricane hardware problems found throughout the building which significantly diminished its ability to resist uplift during periods of inclement weather and high winds.

The building was in such poor condition that Clinton J. Ford P.A. arranged a site meeting with the County's Building Official and their building inspector including the Owners to review a fifty page report and numerous photographs and other documents to substantiate the complaint. After review of the report and inspection of certain electrical issues the Building Official preceded to rescind the Certificate of Occupancy and request the General Contractor to remedy all adverse conditions.

Though the case has not been resolved at this time, the Attorney has been providing legal assistance during its progression without losing valuable downtime by site visits and fact accumulation thereby optimizing his billable time on this case bringing a benefit to his clients.


Clinton J. Ford, MS, CGC, ACA, CIE, has over 24 years of experience as a State Certified General Contractor. He provides consulting support to clients and or attorneys who need assistance during Pre-trial and or Trial, pre or post termination of contractor, investigation of contractor or sub-contractors, licensure issues, permitting issues and or other.

©Copyright - All Rights Reserved

DO NOT REPRODUCE WITHOUT WRITTEN PERMISSION BY AUTHOR.

Related articles

coleman-horowitt-logo.jpg

8/23/2018· Construction

Court Confirms Knowledge of Unlicensed Status Does Not Bar Claim for Recovery

By: Darryl Horowitt

In a previous edition of Construction Alert we reported to you on White v. Cridlebaugh (2009) 178 Cal.App.4th 506, in which the court confirmed that an unlicensed contractor could be sued for recovery of funds, even though the owner had received a benefit from the work performed by the unlicensed contractor. In that case, the owner was unaware that the contractor was unlicensed until after the work was performed.

richard_long_photo.jpg

11/25/2020· Construction

Construction Contract Notice Letters

By: Long International - Richard J. Long

Most construction contracts require written notice for changes, differing site conditions, extra work, or other events which may affect the contractor’s time and cost of performance. The process of giving “notice” is vital to triggering the contract mechanisms that allow the contractor to pursue additional time and cost and to reserve its rights to recover for any unforeseen...

wayne_baruch_logo.jpg

4/24/2012· Construction

Construction: Law, Risk, Liability & Respondeat Superior

By: Wayne Baruch

A construction project involves so many stakeholders *1, each of whom has a several, often competing needs and interests. These interests and parties include, but are certainly not limited to: oneself versus one or more of the other stakeholders, home or business owner, financial, time, aesthetics, functionality, durability, features and specifications of products and materials, regulatory, professional standards, and ethics.

;
Experts.com-No broker Movie Ad
Unicourt Logo Button

Follow us

linkedin logo youtube logo rss feed logo